
| Web Hosting Data Center
Facility :
Our UK facility is situated in Maidenhead, County Berkshire, which is about 20 miles from London. The location of the Data Center ideally makes a it a unanimous choice for clients from all over Asia, Africa and Europe. The UK facility is 10,000 sq.ft.in size, which provides up to 16 Amps per cabinet location with N+1 redundancy at all times. Connectivity Providers : Our Data Center is connected to the Internet with highly redundant network through multiple Gigabit backbones having multiple peering with other networks. Connectivity Speed : We have a total of 20,000mbits of network connectivity for all our Servers. We have 2 x 10 Gbps links for our datacenter. Each Server in our datacenter is setup on 100 Mbps, fully-switched port on an edge switch. Each edge switch is then in turn plugged into two separate aggregation switches at 1gbit, with failover redundancy allowing either 1gbit link to fail. Gateway Connectivity : Our network transit connections are currently to Level 3, Tiscali, and Deutsche Telekom. We also peer with approximately 150 ISPs at the peering points LINX, XChangePoint, and LoNAP. Power Delivery / UPS : In the unlikely event of a power outage from local power grid, all data centers' power systems are designed to run uninterrupted with the help of Two 2000KW auto-switched power generators and centralized UPS systems. Generators are regularly tested & can be used in emergency event of extended utility power outages. Staff : To ensure smooth functioning of day to day operations in Data Center, we have an experienced and knowledgeable staff working 24 x 7 x 365 which includes highly qualified System administrators and network administrators.
|
|||||||||||||||
|